The C350 Pudding Mill Lane project involved the construction of a new cut and cover tunnel to allow the installation of a Crossrail line.
The cut and cover eastbound and westbound tunnel provides the transition between the tunnels running beneath central London and the over ground aspect of the line.
Chem-Crete PAVIX CCC 100 was used on the project to protect the concrete for the foreseeable future.
Chem-Crete PAVIX CCC100 is a unique water-based product for permanent protection of concrete structures and other porous substrates against temperature and moisture associated problems, such as damage caused by freeze-thaw cycles and chloride ion penetration.
It keeps treated concrete reasonably dry, thus eliminates all water and moisture related deterioration. Chem-Crete PAVIX CCC100 is designed specially to protect highway bridges, car parks, buildings and costal structures
THE C350 CROSSRAIL PUDDING MILL LANE PROJECT
The C350 Pudding Mill Lane project involved the construction of a new cut and cover tunnel to allow the installation of a Crossrail line.