Skip to content
THE C350 CROSSRAIL PUDDING MILL LANE PROJECT

THE C350 CROSSRAIL PUDDING MILL LANE PROJECT

The C350 Pudding Mill Lane project involved the construction of a new cut and cover tunnel to allow the installation of a Crossrail line.

Location

London

Client
Substrate

Concrete

The C350 Pudding Mill Lane project involved the construction of a new cut and cover tunnel to allow the installation of a Crossrail line.

The cut and cover eastbound and westbound tunnel provides the transition between the tunnels running beneath central London and the over ground aspect of the line.

Chem-Crete PAVIX CCC 100 was used on the project to protect the concrete for the foreseeable future.

Chem-Crete PAVIX CCC100 is a unique water-based product for permanent protection of concrete structures and other porous substrates against temperature and moisture associated problems, such as damage caused by freeze-thaw cycles and chloride ion penetration.

It keeps treated concrete reasonably dry, thus eliminates all water and moisture related deterioration. Chem-Crete PAVIX CCC100 is designed specially to protect highway bridges, car parks, buildings and costal structures